Improvements to State Road 113 from SR 115 to I-295 include milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutters, traffic signals, lighting, highway signing, guardrail, sidewalks/bicycle path and other incidental construction. Duval Asphalt’s crews paved 2.681 miles with approximately 31,000 tons of asphalt.
![](https://www.duvalasphalt.com/wp-content/uploads/2022/09/digDuval-Asphalt_Southside-Connector_083022_K2-Edit-1-1024x683.jpg)
![](https://www.duvalasphalt.com/wp-content/uploads/2022/09/digDuval-Asphalt_Southside-Connector_083022_K2-Edit-25-1024x683.jpg)
![](https://www.duvalasphalt.com/wp-content/uploads/2022/09/digDuval-Asphalt_Southside-Connector_083022_K2-Edit-35-1024x683.jpg)
![](https://www.duvalasphalt.com/wp-content/uploads/2022/09/digDuval-Asphalt_Southside-Connector_083022_K2-Edit-45-1024x683.jpg)
![](https://www.duvalasphalt.com/wp-content/uploads/2022/09/digDuval-Asphalt_Southside-Connector_083022_K2-Edit-58-1024x683.jpg)
![](https://www.duvalasphalt.com/wp-content/uploads/2022/09/digDuval-Asphalt_Southside-Connector_083022_K2-Edit-67-1024x683.jpg)